Design and construction of an orthodontic practice

Context

After 8 months of design and construction, the office was handed over in January 2023.

The project was designed in close collaboration with the client and the work was carried out from A to Z in a raw concrete room.

Our work

The double-height reception area is highlighted by elegant hanging lights with a duck-blue background for the furnishings.

The firm presented a very specific technical challenge: the management of fluids is a key element for the operation of all the equipment and treatment chairs.